Coca-Cola CPS
AURA | Condition-Based Maintenance
OneLake Fabric: Live · 2s ago
2
Ballina

Machine & Consumable Drill-Down

Component Profile

OEM Part # AB3UEP7PH4

Pall Fluorodyne II 0.2µm Sanitary Cartridge Pack

Compounding Vessel CV-04 Discharge Skid

Installed
42 op. days ago
OEM Lifespan
45 days
Calendar life used93%
True Predicted RUL
145 batch h
~16 op. days
Health Score
72 / 100
Stable Degradation

Differential Pressure vs. Normalized Resistance

24h rolling · ΔP (PSI) / R-norm

Cumulative Throughput & SIP Steam Cycles

V-cum (hL) · SIP cycles: 18

Prescription

Safe to run for 12 additional batches.

Snap replacement to planned CIP sanitation stop on Thursday, 02:00 AM.

Action & Alerts Center

ScheduledBallina · this plant

Filter Membrane Pack – Skid B-02

Trigger: Scheduled changeover window sync.

Liam Byrne· Shift Sanitation & Maintenance Team Alpha
Required action
Reserve Pall 0.2µm Kit in Warehouse (Bin WH-B12)
CriticalMidi / Signes

High-Pressure Piston Seal – Homogenizer H-01

Trigger: Micro-gap cavitation vibration detected.

Jean-Luc Mercier· Mechanical Reliability Lead
Required action
Dispatch SAP PM01 Emergency Work Order & Lock Parts
InspectionCairo

Aseptic Diaphragm Valve O-Rings – Manifold M-04

Trigger: Thermal cycle count reached 25 steam sterilizations.

Ahmed Mansoor· Area Technician
Required action
Perform shadow visual inspection during 08:00 flush.
CriticalEswatini / Matsapha

Dosing Pump Diaphragm – DP-07

Trigger: Stroke-rate drift +6.2% vs. setpoint.

Thandiwe Dlamini· Reliability Engineer
Required action
Dispatch SAP PM01 Emergency Work Order & Lock Parts
ScheduledMoriyama

Extraction Mesh Screens – CV-02

Trigger: Planned CIP stop alignment.

Haruto Sato· Precision Maintenance Lead
Required action
Reserve mesh kit (Bin MO-A04)