Ballina
Machine & Consumable Drill-Down
Component Profile
OEM Part # AB3UEP7PH4
Pall Fluorodyne II 0.2µm Sanitary Cartridge Pack
Compounding Vessel CV-04 Discharge Skid
Installed
42 op. days ago
OEM Lifespan
45 days
Calendar life used93%
True Predicted RUL
191 batch h
~21 op. days
Health Score
77 / 100
Stable DegradationDifferential Pressure vs. Normalized Resistance
24h rolling · ΔP (PSI) / R-norm
Cumulative Throughput & SIP Steam Cycles
V-cum (hL) · SIP cycles: 18
Prescription
Safe to run for 16 additional batches.
Snap replacement to planned CIP sanitation stop on Thursday, 02:00 AM.
Action & Alerts Center
ScheduledBallina · this plant
Filter Membrane Pack – Skid B-02
Trigger: Scheduled changeover window sync.
Liam Byrne· Shift Sanitation & Maintenance Team Alpha
Required action
Reserve Pall 0.2µm Kit in Warehouse (Bin WH-B12)
CriticalMidi / Signes
High-Pressure Piston Seal – Homogenizer H-01
Trigger: Micro-gap cavitation vibration detected.
Jean-Luc Mercier· Mechanical Reliability Lead
Required action
Dispatch SAP PM01 Emergency Work Order & Lock Parts
InspectionCairo
Aseptic Diaphragm Valve O-Rings – Manifold M-04
Trigger: Thermal cycle count reached 25 steam sterilizations.
Ahmed Mansoor· Area Technician
Required action
Perform shadow visual inspection during 08:00 flush.
CriticalEswatini / Matsapha
Dosing Pump Diaphragm – DP-07
Trigger: Stroke-rate drift +6.2% vs. setpoint.
Thandiwe Dlamini· Reliability Engineer
Required action
Dispatch SAP PM01 Emergency Work Order & Lock Parts
ScheduledMoriyama
Extraction Mesh Screens – CV-02
Trigger: Planned CIP stop alignment.
Haruto Sato· Precision Maintenance Lead
Required action
Reserve mesh kit (Bin MO-A04)